Finot Engineering is pleased to announce the successful completion of its subcontracted works on the Adama Water Supply Project, a significant initiative aimed at enhancing water infrastructure in the Adama-Mojo area.
As a key subcontractor to CGCOC Group, Finot Engineering undertook the construction of six boreholes, each equipped with a valve house, guard house, toilet, generator house, transformer setup, and perimeter fencing. The project also encompassed the installation of 16 valve chambers, 11 thrust blocks, and three encasement thrust blocks totaling 40 meters in length. Additionally, the team constructed 11 crossing columns, with crossing structures ranging from 2.5 to 10 meters in height, to ensure the integrity of the water transmission lines across various terrains.
Currently, the project is on the handover phase, with all deliverables completed and final payment underway. This milestone underscores Finot Engineering’s commitment to delivering high-quality infrastructure solutions that contribute to Ethiopia’s sustainable development goals.