Contractor: FINOT Engineering and Trading PLC. with Nantong Construction Group Co. Ltd. (Chines company Ethiopia Branch)
Project Scope: The project scope involves civil engineering works for the BELES-1 Sugar Factory, including rigid pavement roads, underground structures like foundations and tunnels, superstructure works such as slabs and columns, as well as cable trenches, masonry, and finishing tasks like plastering, painting, and tiling
Project Overview
FINOT Engineering and Trading Plc was engaged by Nantong Construction Group Co. Ltd. (Ethiopia Branch) as a designated sub-contractor for the execution of major civil construction activities within the BELES-1 Sugar Factory Project. The assignment formed part of the main contract between the Ethiopian Sugar Corporation and Nantong, and required the delivery of complex and high-quality civil engineering works essential to the factory’s overall infrastructure. The project scope included a wide range of structural, underground, and finishing works. Key tasks completed under this contract comprise:
Factory Internal Rigid Pavement Road
Works, involving the construction of durable
internal road networks capable of supporting heavy industrial traffic.
Underground Civil Works, including foundations, tunnels, conveyor belt foundations,
pedestals, and weight bridge structures.
Superstructure Civil Works, such as slabs,
columns, conveyor belt pedestals, corbels,
and other technically demanding structural
components.
Cable Trench Construction, supporting the
factory’s electrical and communication
infrastructure.
Masonry Works required for various building components within the facility.
Finishing Works, including plastering, painting, and tiling to ensure functional and aesthetic completion of structures.